Patterns Across Case Files
This page is the cross-reference layer of the registry. Individual case files are scoped to one place or one policy and never draw conclusions beyond it — that restraint is what makes each of them defensible on its own. But readers arriving with a general question ("is this happening everywhere, or just here?") need somewhere to look, and this is that place.
Everything below is an index, not an argument. Each pattern names something that appears in more than one case file, and each piece of evidence links to the file where that fact is documented and sourced. Nothing here is asserted that isn't already established, with a citation, somewhere else on this site. Where the documentary record contradicts itself, that is recorded too, in its own section — a registry that quietly picks the tidier number is not a registry worth citing.
01Comment periods compressed against the process that built the protection
In five files the window for public input on undoing a protection is substantially shorter than the process that created it, or absent entirely.
- Chaco Culture National Historical Park (Greater Chaco Landscape)The scoping window on revoking the 336,404-acre withdrawal opened at seven days on March 31, 2026. The withdrawal itself came out of a roughly 1.5-year process carrying 150 days of public comment.
- Red Desert / Rock Springs Resource Management PlanA 30-day scoping window, later extended 45 days, to amend a plan that took 12 years and two extended comment periods to complete.
- Tongass National Forest (2001 Roadless Rule Rescission)Scoping closed September 19, 2025. As of May 2026 the Forest Service had held no public meetings specific to the Tongass; the Southeast Alaska Conservation Council convened its own hearings instead.
- Pinyon Plain Uranium Mine (Baaj Nwaavjo I'tah Kukveni National Monument, Grand Canyon region)Arizona regulators are 'not required to accept formal comments' on the arsenic-limit permit amendment the Havasupai Tribe is formally contesting.
- Big Bend National ParkNo environmental impact study was conducted, a direct consequence of the IIRIRA section 102(c) waivers.
02Consultation structures dismantled, not merely bypassed
Four files record the removal or circumvention of a standing consultation mechanism — a different act from declining to consult on a single decision, because it removes the venue for the next one as well.
- Bears Ears National MonumentThe July 13, 2026 proclamation declared the Bears Ears Commission 'disbanded and terminated.' Interior had committed in a June 2025 letter to contact the Commission before any boundary or management change; the Coalition states no such consultation occurred.
- Chaco Culture National Historical Park (Greater Chaco Landscape)A Chaco Heritage Tribal Association cultural-resources study, funded by Interior and completed in 2025, was reportedly not incorporated into BLM's 'little to no effect' determination.
- Pinyon Plain Uranium Mine (Baaj Nwaavjo I'tah Kukveni National Monument, Grand Canyon region)The Havasupai Tribe states it was cut out of the Energy Fuels-Navajo Nation haul-route negotiations. The Forest Service was separately documented as 'not a part of' those talks.
- Tongass National Forest (2001 Roadless Rule Rescission)Tribal governments have explicitly asked to be treated as cooperating agencies in the environmental review, indicating that status had not been granted as of their public statements.
03Statutory review waived, downgraded a tier, or routed outside the Federal Register
Four files record the level of environmental or procedural review being lowered rather than the underlying decision being argued on its merits.
- Big Bend National ParkMore than 28 federal laws waived under IIRIRA section 102(c), including the NPS Organic Act, ESA, Clean Water Act and Clean Air Act — the first time such a set was waived for construction inside a national park.
- Red Desert / Rock Springs Resource Management PlanThe amendment proceeds by environmental assessment, a lower tier of NEPA review than the environmental impact statement that produced the plan being amended.
- Chaco Culture National Historical Park (Greater Chaco Landscape)The draft environmental assessment phase was tracked only on BLM ePlanning under DOI-BLM-NM-F010-2026-0002-EA; per BLM it never reached the Federal Register.
- Artificial Intelligence as a Driver of Public-Lands ThreatsExecutive Order 14318 section 5 directs agencies to identify NEPA categorical exclusions usable for data-center projects and to streamline ESA section 7 consultation for common construction activities.
04Recently completed, multi-year decisions reopened within months
Four files record a protection being undone close enough to its completion that the record of the process producing it was still current.
- Red Desert / Rock Springs Resource Management PlanPlan finalized December 2024; Interior granted review authority February 2025; notice of intent to amend published October 2, 2025 — nine months after a 12-year process closed.
- Boundary Waters Canoe Area Wilderness (Superior National Forest watershed)Public Land Order 7917, issued January 26, 2023 for a 20-year term, was revoked by H.J.Res. 140 in April 2026.
- Grand Staircase-Escalante National MonumentThe January 2025 Record of Decision drew a Congressional Review Act disapproval resolution, S.J.Res. 109, within roughly a year of signing.
- Bears Ears National MonumentRestored to approximately 1.36 million acres in October 2021; reduced to approximately 121,096 acres on July 13, 2026.
05Mechanisms that foreclose future protection, not only present protection
Three files record actions whose documented effect extends past the decision at hand to constrain what a later administration or Congress can restore.
- Boundary Waters Canoe Area Wilderness (Superior National Forest watershed)Earthjustice records H.J.Res. 140 as the first use of the Congressional Review Act to eliminate a public-lands mineral withdrawal. Opponents state the CRA's bar on rules in 'substantially the same form' blocks any similar future withdrawal absent new congressional authorization.
- Bears Ears National MonumentTerminating the Commission removes the standing government-to-government co-management structure, not only the boundary — a restored boundary would not restore the body.
- Artificial Intelligence as a Driver of Public-Lands ThreatsExecutive Order 14318's ESA section 7 streamlining for common construction activities is framed over a ten-year horizon.
06Openings mandated or expedited, met with limited commercial interest
Four files record the commercial case for the extraction being opened as weak, unproven, or historically loss-making on the documentary record.
- Arctic National Wildlife Refuge — Coastal Plain688,829 acres offered on June 5, 2026; 5 tracts covering 72,049 acres drew bids; approximately $3.7 million in total high bids from two bidders, with no major oil company participating.
- Grand Staircase-Escalante National MonumentThe Utah Geological Survey records the monument's known coal, oil and gas and mineral resources as 'generally undeveloped because market areas are distant' and transport routes are limited.
- Boundary Waters Canoe Area Wilderness (Superior National Forest watershed)Antofagasta acquired Twin Metals after a 2014 disclosure showing a projected rate of return of roughly 10%.
- Tongass National Forest (2001 Roadless Rule Rescission)A published estimate puts the cost of industrial Tongass logging to taxpayers at $1.7 billion over 40 years.
07A stated AI and energy-demand rationale sits upstream of land decisions
Four files trace back to instruments whose own stated purpose invokes artificial-intelligence infrastructure. The linkage is documentary, not inferred: it is what the orders say. Where an agency action does not itself invoke AI, the case file says so explicitly.
- Artificial Intelligence as a Driver of Public-Lands ThreatsExecutive Order 14261 section 1 ties coal resources to 'the rise in electricity demand due to... the construction of artificial intelligence data processing centers,' and section 10 is titled 'Powering Artificial Intelligence Data Centers.'
- Federal Coal Lands — Nationwide Leasing ExpansionInterior opened 13.1 million acres to coal leasing and cut the royalty rate to 7% citing that order — while the release itself does not mention AI or data centers, a distinction the file preserves.
- Big Bend National ParkThe technology component of the 'smart wall' in this region is Anduril's AI-enabled Sentry Towers, feeding the company's Lattice software.
- Pinyon Plain Uranium Mine (Baaj Nwaavjo I'tah Kukveni National Monument, Grand Canyon region)Uranium was added to the USGS 2025 critical minerals list, the list that governs which domestic supply chains receive priority treatment.
08The same parties recur across otherwise unrelated files
Named companies and agencies appear in more than one case file, in matters that share no geography. The recurring-parties table below is generated from the Named Companies section of every file, so it stays accurate as files change.
| Party | Appears in | Files |
|---|---|---|
| Anduril Industries | Artificial Intelligence as a Driver of Public-Lands Threats, Big Bend National Park | 2 |
| Energy Fuels Resources (USA) Inc. (subsidiary of Energy Fuels Inc., Canada) | Bears Ears National Monument, Pinyon Plain Uranium Mine (Baaj Nwaavjo I'tah Kukveni National Monument, Grand Canyon region) | 2 |
| NOAA / National Marine Fisheries Service | Northeast Canyons and Seamounts Marine National Monument, Pacific Marine National Monuments (Papahānaumokuākea, Pacific Islands Heritage, Mariana Trench, Rose Atoll) | 2 |
| U.S. Department of Energy | Artificial Intelligence as a Driver of Public-Lands Threats, Federal Coal Lands — Nationwide Leasing Expansion | 2 |
09Operative dates fall after the announcement
Five files carry a future date on which something changes — the point at which a signed decision becomes an operative one. These are the dates a reader tracking this registry should be watching.
- Bears Ears National MonumentExcluded lands scheduled to reopen to new mining claims and mineral leasing on or about September 11, 2026, 60 days after the July 13 proclamation.
- Grand Staircase-Escalante National MonumentExcluded lands scheduled to reopen on the same date, on or about September 11, 2026.
- Red Desert / Rock Springs Resource Management PlanBLM's target for a signed Record of Decision on the amended plan is October 2, 2026.
- Boundary Waters Canoe Area Wilderness (Superior National Forest watershed)The Governor's and DNR's authority to cancel the state mineral leases is reported to run only through the end of 2026.
- Arctic National Wildlife Refuge — Coastal PlainThe second of four lease sales mandated by section 50104 is due by July 4, 2028.
⚠Where the record contradicts itself
Agencies, courts, and reporters do not always agree on a number, a date, or a document number. When they disagree, this registry states every figure and names its source rather than quietly picking the cleanest one. Each row below corresponds to a conflict flag or a corrections-log entry on the case file it links to. This table is, deliberately, a list of the places where this site is least certain.
| Subject | Figures on record | How the registry handles it |
|---|---|---|
| Acreage of the withdrawal under Public Land Order 7923 Chaco Culture National Historical Park (Greater Chaco Landscape) | 336,404 acres (BLM press release) · 336,425 acres (BLM project description, quoted by Deseret News) · 338,690 acres (Environment America / New Mexico Wilderness Alliance) | The registry uses BLM's 336,404 and states all three. |
| Enacted FY2026 National Park Service funding National Park Service — Nationwide Budget & Staffing Cuts | $3.267 billion (CRS, whole agency) · $2.88 billion (NPCA, operations account) | These measure different things. Both are stated; neither is preferred. |
| Anduril Extended Range Sentry Tower contract value Artificial Intelligence as a Driver of Public-Lands Threats | $363 million (Anduril announcement and most trade press) · at least $367 million (Bloomberg Government, SBIR Phase III order) | Appears to be base-award versus task-order accounting. The registry uses $363 million and records the other. USASpending/FPDS records would settle it. |
| Direct U.S. data-center water consumption, 2023 Artificial Intelligence as a Driver of Public-Lands Threats | 17.4 billion gallons (LBNL/EPA) · 17.5 billion gallons (IEEE Spectrum) · 163.7 billion gallons/year (Nature-derived, 2021, different basis) | The first two are effectively the same figure. The third measures differently. The registry uses LBNL's 17.4 billion. |
| Executive order number for the data-center permitting order Artificial Intelligence as a Driver of Public-Lands Threats | 14318 · 14148 · 14149 (varying across law-firm analyses) | The White House text is authoritative; 14318 is the most consistent citation. The discrepancy is recorded. |
| Technically recoverable coal, Kaiparowits Plateau field within the monument Grand Staircase-Escalante National Monument | approximately 11 billion tons (press coverage) · minimum 11.36 billion tons (Utah Geological Survey, on a 1996 USGS assessment) | Likely the same assessment restated. Both are stated; the UGS document carrying 11.36 has not been retrieved and confirmed. |
| Tongass inventoried roadless acreage affected Tongass National Forest (2001 Roadless Rule Rescission) | 9.3 million acres (Federal Register notice of intent) · 9.2 million acres (High Country News) | The registry uses the Federal Register figure. Logged as a correction on 2026-08-17. |
| Date ore hauling resumed after the pause Pinyon Plain Uranium Mine (Baaj Nwaavjo I'tah Kukveni National Monument, Grand Canyon region) | February 12, 2025 · February 12, 2026 | Unresolved. The 2025 date is retained as consistent with the July 2024 pause and January 2025 agreement already documented. Pending a primary source. |
| Ore trucks per day on the haul route Pinyon Plain Uranium Mine (Baaj Nwaavjo I'tah Kukveni National Monument, Grand Canyon region) | as many as 10/day at 24 tons each (Energy Fuels) · between 2 and 12/day on weekdays (Arizona Mirror) · 2/day in February 2026 (Navajo Nation) | All three stated; they may describe different periods. |
| Acreage of the five tracts that drew bids on June 5, 2026 Arctic National Wildlife Refuge — Coastal Plain | 72,049 acres (Taxpayers for Common Sense) · 72,490 acres (Alaska Public Media) | The same four digits transposed, so one is a typographical error. The registry does not know which and states both. |
| Award date of the $1.7 billion Big Bend Project 4 contract Big Bend National Park | May 11, 2026 (CBP Smart Wall documentation) · reported May 15-20, 2026 | Award on May 11; public reporting and CBP's response the following week. Logged as a clarification on 2026-08-17. |
☰Every file, side by side
All 14 case files on record. Every cell is pulled directly from that file — nothing is added or interpreted for this table. The consultation column shows the first documented sentence of that file's full Tribal / Public Consultation Status section; a one-sentence excerpt cannot carry every nuance, so read the file itself before citing it.
| Case File | Scope | Threat Category | Status | Consultation / Process Note | Last Verified |
|---|---|---|---|---|---|
| Artificial Intelligence as a Driver of Public-Lands Threats | System-wide | Agency capacity — federal policy linking AI infrastructure to public-land use | Active — orders in force, federal sites selected, no BLM public-land site identified | Not yet documented. | 2026-08-17 |
| Arctic National Wildlife Refuge — Coastal Plain | Place | Oil and gas drilling — Coastal Plain lease sales | Active — first of four mandated lease sales completed | Gwich'in leadership has been engaged in opposition advocacy for decades, but a formal, project-specific tribal consultation record for the June 2026 lease sale was not identified in current sourcing. | 2026-08-17 |
| Bears Ears National Monument | Place | Monument boundary rollback / mining and drilling | Boundary cut — reopening to mining claims in progress | The July 13, 2026 proclamation itself declared the Bears Ears Commission "disbanded and terminated." The Commission was the formal tribal consultation body that had been in place since the 2016 designation to guide co-management with the five sovereign tribal nations. | 2026-08-17 |
| Big Bend National Park | Place | Border wall / vehicle barrier construction | Contracted — construction underway in phases | Tribal consultation status specific to this project is not yet documented — the waived-laws list includes the Native American Graves Protection and Repatriation Act and the Antiquities Act, both of which normally require consultation, but no record of consultation having occurred, been offered, or been formally declined was identified in current sourcing. | 2026-08-17 |
| Boundary Waters Canoe Area Wilderness (Superior National Forest watershed) | Place | Sulfide-ore copper-nickel mining — mineral withdrawal reversal | Reversed — 20-year mining ban overturned; leases advancing | Not yet documented — a tribal consultation record specific to this project was not identified in current sourcing. | 2026-08-17 |
| Chaco Culture National Historical Park (Greater Chaco Landscape) | Place | Oil and gas drilling — mineral withdrawal revocation | Proposed — public comment period closed, decision pending | The Interior Department began tribal consultation on reversing PLO 7923 on October 30, 2025. | 2026-08-17 |
| Federal Coal Lands — Nationwide Leasing Expansion | System-wide | Coal leasing expansion — mineral withdrawal reversal and royalty reduction | Active — acreage opened and royalty rate cut; lease sales not yet documented | Not yet documented — the tribal consultation and public comment record for the September 29, 2025 action and for the Federal Register notice ending the Jewell Moratorium has not be… | 2026-08-17 |
| Pinyon Plain Uranium Mine (Baaj Nwaavjo I'tah Kukveni National Monument, Grand Canyon region) | Place | Uranium mining — active groundwater contamination risk | Active — in production, water/permit disputes ongoing | The Forest Service was documented as "not a part of" discussions between Energy Fuels and the Navajo Nation over ore-transport routes across Navajo land in 2024 — meaning the relevant federal land-managing agency was absent from the tribal negotiation that determined how ore moves across a second tribal nation's territory. | 2026-08-17 |
| Grand Staircase-Escalante National Monument | Place | Monument boundary rollback / mining and drilling | Boundary cut — reopening to mining claims in progress | Not yet documented — a tribal or public consultation record specific to the July 13, 2026 boundary reduction was not identified in current sourcing, distinct from the Society of Vertebrate Paleontology's 2017 litigation over the earlier rollback. | 2026-08-17 |
| Northeast Canyons and Seamounts Marine National Monument | Place | Commercial fishing access opened within protected monument waters | Reversed — proclamation signed and implementing rule published | Not yet documented — the public-comment record for NOAA's April 6, 2026 final rule, and any tribal or community consultation associated with it, has not been retrieved for this pag… | 2026-08-17 |
| National Park Service — Nationwide Budget & Staffing Cuts | System-wide | Agency capacity — budget cuts and staff reductions | Active — proposed cuts partly rejected by Congress for FY26; FY27 proposal pending | Not applicable in the traditional tribal-consultation sense (this is an agency budget/staffing action, not a land-designation or leasing action); however, NPCA specifically credits… | 2026-08-17 |
| Pacific Marine National Monuments (Papahānaumokuākea, Pacific Islands Heritage, Mariana Trench, Rose Atoll) | Place | Commercial fishing access opened within protected monument waters | Active — proclamations signed, regulatory rulemaking and litigation ongoing | Not yet documented — a Native Hawaiian or Pacific Islander community consultation record specific to the June 2026 proclamation was not identified in current sourcing, and formal organizational resolutions (for example from the Office of Hawaiian Affairs) were not located as of August 17, 2026. | 2026-08-17 |
| Red Desert / Rock Springs Resource Management Plan | Place | Resource Management Plan rollback — oil, gas, and mineral access expansion | Active — plan amendment in progress, comment period closed | The finalized 2024 plan followed an unusually extensive public process: begun in 2011, spanning 13 years, including a governor's task force with local government, industry, and grazing representation, and a comment period extended at the governor's own request. | 2026-08-17 |
| Tongass National Forest (2001 Roadless Rule Rescission) | Place | Logging / road construction — roadless rule rescission | Proposed rescission — draft EIS expected 2026, litigation history ongoing | When the Trump administration previously proposed removing Tongass roadless protections (a distinct, earlier 2020 action), 96% of public comments submitted opposed the proposal. | 2026-08-17 |
Using this page
Every fact above is established, with a citation, on the case file it links to — follow the link before quoting it, so you are citing the source rather than citing us. If you find a pattern the registry has missed, or evidence that one of these is weaker than it looks, submit it: a pattern that survives contradiction is worth more than one that was never tested. Machine-readable copies of the whole registry are at registry.json and registry.csv.